Solar · Engie · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
21 Jul 2026 18:10 → 22 Jul 2026 18:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2025-09-30 | 0.9328 |
| 2026-07-01 | 0.9261 |
| Capex total (greenfield) |
$332.99M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,331,967
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
ENGIE’s project page confirms Goorambat East Solar Farm is a 250 MW single-axis tracking solar farm under construction in Victoria, with construction completion expected in 2026 and generation expected in 2027. No project-specific total investment/capex figure was found in the searched owner/government sources, so capex is left null rather than substituting an AEMO benchmark. For operating assumptions, the available source only confirms SAT configuration and typical utility-scale PV performance context; no plant-specific O&M or fuel data were found. Asset life set to a typical solar project planning assumption of ~30 years; use with caution.