Goorambat East Solar Farm (ENGIE)

Solar · Engie · Solar PV - Single axis tracking

Development AEMO: Committed Solar - Solar NEM data · 24 hours
250 MW
Registered nameplate capacity
Est. SRMC
$0.25/MWh
Key information
Capacity
250 MW

AEMO status Committed
Project status Development (AI)

Coordinates

DUID
Owner Engie
Commissioned Oct 2026
Expected closure 2061
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
250 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$332.99M

Shown in table
$332.99M (2026 real AUD)

Reported / source value
$325.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,331,967

Shown in table
$1.33M (2026 real AUD)

Reported / source value
$1.30M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
ENGIE’s project page confirms Goorambat East Solar Farm is a 250 MW single-axis tracking solar farm under construction in Victoria, with construction completion expected in 2026 and generation expected in 2027. No project-specific total investment/capex figure was found in the searched owner/government sources, so capex is left null rather than substituting an AEMO benchmark. For operating assumptions, the available source only confirms SAT configuration and typical utility-scale PV performance context; no plant-specific O&M or fuel data were found. Asset life set to a typical solar project planning assumption of ~30 years; use with caution.