Solar · Engie · Solar PV - Single axis tracking
12 Jun 2026 17:10 → 13 Jun 2026 17:10 AEST
| Capex total (greenfield) |
$332.99M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,331,967
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
ENGIE’s project page confirms Goorambat East Solar Farm is a 250 MW single-axis tracking solar farm under construction in Victoria, with construction completion expected in 2026 and generation expected in 2027. No project-specific total investment/capex figure was found in the searched owner/government sources, so capex is left null rather than substituting an AEMO benchmark. For operating assumptions, the available source only confirms SAT configuration and typical utility-scale PV performance context; no plant-specific O&M or fuel data were found. Asset life set to a typical solar project planning assumption of ~30 years; use with caution.