Solar · Goonumbla Asset Co Pty Ltd as trustee for the Goonumbla Asset Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 May 2026 15:25 → 13 Jun 2026 15:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8969 |
| 2025-07-01 | 0.8888 |
| Capex total (greenfield) |
$95.65M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
I found a project-specific greenfield capital cost in the planning-stage environmental assessment, but it was for an early 150 MWpeak concept with a preliminary total cost of about $223.5 million, not the final 69.75 MWac registered plant. I did not use it as the plant capex because it does not clearly match the commissioned DUID capacity. FRV sources confirm the project size (69.75 MWac/68.7 MWac), single-axis tracking, construction in 2019-2020, and operation from 2020, but they do not disclose a final project-specific investment total for the commissioned plant. O&M and other operating assumptions were not found in source-backed plant-specific form, so I left them blank rather than infer from benchmarks.