Wind · Golden Plains WF1 Pty Ltd as trustee for the Golden Plains WF1 Unit Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-08-06 | 0.9808 |
| 2025-07-01 | 0.9834 |
| Capex total (greenfield) |
$3,275.11M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$13,206,085
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$7.69M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$30,995
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$0.50
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project-specific capex was reported by the project website as a '$3 billion plus' development cost for the Golden Plains Wind Farm, with Stage 1 (Golden Plains Wind Farm East, 756 MW) commencing construction in January 2023. Because the source is stated as 'plus', the capex_total_aud is set to the conservative floor of $3.0 billion and capex_per_mw_aud is calculated on the 756 MW Stage 1 capacity, not the full 1,330 MW precinct. Fixed O&M uses AEMO/Aurecon 2024 onshore wind benchmark of $29,383/MW-year; variable O&M is included in the fixed component per the benchmark source.