Wind · Golden Plains WF1 Pty Ltd as trustee for the Golden Plains WF1 Unit Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 19:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-08-06 | 0.9808 |
| 2025-07-01 | 0.9834 |
| Capex total (greenfield) |
$3,504.67M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$14,131,746
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table How this was derived |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
How this was derived Reference |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific public project cost was not found for this DUID alone. Used the owner/developer project announcement for the Golden Plains Wind Farm project, which states the project cost increased from $1.7 billion to $3 billion; this appears to cover the broader Golden Plains project/stage scope rather than a standalone 248 MW unit. Per-MW capex is calculated using the 756 MW Golden Plains Wind Farm East stage capacity referenced by the owner and CEFC. O&M not separately verified; no plant-specific source found. Onshore wind design life typically 25 years, but Australian projects often target 30 years or more.