Glenrowan West Solar Farm (GLRWNSF1)

Solar · Glenrowan Sun Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 24 hours
132 MW
Registered nameplate capacity
24 hours revenue
$305
Capacity factor
0.3%
Revenue / MWh
$28.90
Est. SRMC
$0.32/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
132 MW

AEMO status In Service
Project status Operational (AI)

Glenrowan West Solar Farm website: ‘Connected and Generating Clean Energy’ / commissioned and exporting since Dec 2020; pv magazine Australia 2021 says completed and commissioned.

Region VIC1
Coordinates -36.48694, 146.14392 (AI)

Glenrowan West Solar Farm website lists site location coordinates: Latitude -36.486943, Longitude 146.143921.

MLF 0.9402
DUID GLRWNSF1
Owner Glenrowan Sun Farm Pty Ltd
Commissioned Apr 2021
Expected closure 2051
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Unknown
Module / inverter supplier PV module / inverter supplier
Inverter OEM Unknown
Inverter model 48 central inverters
Equipment confidence medium
Stats window
12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Dispatch & revenue

12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Energy revenue (× MLF)
$305
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
10.6 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9402
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9455
2025-07-01 0.9402

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
132 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.32/MWh
Capex total (greenfield)
$156.25M

Shown in table
$156.25M (2026 real AUD)

Reported / source value
$120.00M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as the only located project-specific cost reference; treated as a nominal project cost estimate, not an AEMO benchmark.

Reference
Glenrowan West Solar Farm set for construction after purchase by Germany’s Wirtgen Invest (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$1,183,712

Shown in table
$1.18M (2026 real AUD)

Reported / source value
$909.1k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from the located project-cost estimate and the user-provided 132 MW capacity.

Reference
Glenrowan West Solar Farm set for construction after purchase by Germany’s Wirtgen Invest (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$3.38M

Shown in table
$3.38M (2026 real AUD)

Reported / source value
$2.64M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$25,641

Shown in table
$25.6k (2026 real AUD)

Reported / source value
$20.0k (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.32

Shown in table
$0.32 (2026 real AUD)

Reported / source value
$0.25 (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 08 Jun 2026

Notes
Plant-specific capex was not directly disclosed by the owner/developer in the sources found. The only plant-specific project cost located was a prior estimate that the project was 'suggested to cost in the range of $120 million' for the ready-to-construct Glenrowan West Solar Farm; this is used as a reported project-cost proxy, not an AEMO benchmark. The site is described as 149 MWp DC / 110 MW AC in sources, while the user-provided registered capacity is 132 MW; capex_per_mw_aud is calculated using the user-provided 132 MW capacity. O&M and performance fields use server-side defaults where no plant-specific source was found. Expected operating life from the project website is at least 30 years.