Glenrowan Solar Farm (GLENSF1)

Solar · Glenrowan Solar Farm Pty Ltd as trustee for Glenrowan Solar Farm Trust · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 7 days
126 MW
Registered nameplate capacity
7 days revenue
$43.7k
Capacity factor
25.5%
Revenue / MWh
$8.10
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
126 MW

AEMO status In Service
Project status Operational (AI)

Pacific Partnerships Energy project page (2026): site says Glenrowan Solar Farm has been generating renewable energy since late 2023 and is fully operational.

Region VIC1
Coordinates -36.43800, 146.30900 (AI)

Glenrowan Solar Farm website (2026): project located 2km south-west of Glenrowan, Victoria.

MLF 0.9294
DUID GLENSF1
Owner Glenrowan Solar Farm Pty Ltd as trustee for Glenrowan Solar Farm Trust
Commissioned Feb 2024
Expected closure 2053
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM —
Module / inverter supplier single-axis tracking solar PV
Inverter OEM —
Inverter model —
Equipment confidence low
Stats window
18 Sep 2026 17:00 → 25 Sep 2026 17:00 AEST

Dispatch & revenue

18 Sep 2026 17:00 → 25 Sep 2026 17:00 AEST

Energy revenue (× MLF)
$43.7k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
5,395.7 MWh
Available
5,414.4 MWh
Curtailed
560.1 MWh
Curtailment
10.3%
of available
MLF used
0.9294
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9626
2025-07-01 0.9490
2026-07-01 0.9294

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
126 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$172.78M

Shown in table
$172.78M (2026 real AUD)

Reported / source value
$163.80M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific total project cost or investment announcement was found in the retrieved official sources.

Capex refurbishment
—
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Plant-specific greenfield capex was not found in official owner/developer, government, or finance announcements from the search results. The project is documented as a 130 MWdc solar farm with single-axis tracking, and construction/financial close timing indicates commissioning in 2023-2024, but no total project investment figure was located. AEMO/CSIRO benchmark values were not applied because the requested capex priority requires a plant-specific figure first. Technology default operating assumptions were not substituted because no source-backed large-scale solar O&M benchmark was extracted in the retrieved excerpts. Asset life set to a typical utility-scale solar PV planning assumption only.

Sources