Glenrowan Solar Farm (GLENSF1)

Solar · Glenrowan Solar Farm Pty Ltd as trustee for Glenrowan Solar Farm Trust · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 7 days
126 MW
Registered nameplate capacity
7 days revenue
$48.1k
Capacity factor
9.1%
Revenue / MWh
$24.90
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
126 MW

AEMO status In Service
Project status Operational (AI)

Pacific Partnerships Energy project page (2026): site says Glenrowan Solar Farm has been generating renewable energy since late 2023 and is fully operational.

Region VIC1
Coordinates -36.43800, 146.30900 (AI)

Glenrowan Solar Farm website (2026): project located 2km south-west of Glenrowan, Victoria.

MLF 0.9490
DUID GLENSF1
Owner Glenrowan Solar Farm Pty Ltd as trustee for Glenrowan Solar Farm Trust
Commissioned Feb 2024
Expected closure 2053
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier single-axis tracking solar PV
Inverter OEM
Inverter model
Equipment confidence low
Stats window
07 Jun 2026 06:00 → 14 Jun 2026 06:00 AEST

Dispatch & revenue

07 Jun 2026 06:00 → 14 Jun 2026 06:00 AEST

Energy revenue (× MLF)
$48.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,929.9 MWh
Available
1,929.9 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9490
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9626
2025-07-01 0.9490

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
126 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$172.78M

Shown in table
$172.78M (2026 real AUD)

Reported / source value
$163.80M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific total project cost or investment announcement was found in the retrieved official sources.

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Plant-specific greenfield capex was not found in official owner/developer, government, or finance announcements from the search results. The project is documented as a 130 MWdc solar farm with single-axis tracking, and construction/financial close timing indicates commissioning in 2023-2024, but no total project investment figure was located. AEMO/CSIRO benchmark values were not applied because the requested capex priority requires a plant-specific figure first. Technology default operating assumptions were not substituted because no source-backed large-scale solar O&M benchmark was extracted in the retrieved excerpts. Asset life set to a typical utility-scale solar PV planning assumption only.