Solar · Glenellen Solar Farm Pty Ltd · Solar PV - Fixed
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
22 Jul 2026 04:40 → 23 Jul 2026 04:40 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2025-11-11 | 0.9255 |
| 2026-07-01 | 0.8977 |
| Capex total (greenfield) |
$272.93M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,049,714
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.62M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$13,100
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific capital value of c. A$250 million appears in the NSW planning amendment report for the 200 MW project. No separate refurbishment cost identified. Fixed O&M uses AEMO/Aurecon 2024 large-scale solar PV benchmark of A$12,000/MWp/year; for 200 MW this implies about A$2.4 million/year. The project is described by GPG as its biggest solar farm to date and began construction in September 2024.