Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 04:30 → 14 Jun 2026 04:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9403 |
| 2025-07-01 | 0.9461 |
| Capex total (greenfield) |
$1,033.76M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,691,983
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$4.94
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$4.96
Shown in table Reported / source value How this was derived Reference |
| Heat rate GJ/MWh |
10.80
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Gladstone Power Station is Queensland’s largest coal station with six 280 MW units (1,680 MW total). No verified greenfield capex figure was located; therefore capex fields remain unset. If a refurbishment or life-extension figure becomes available, it should be recorded separately as capex_refurbishment_aud rather than greenfield capex.