Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 03:30 → 14 Jun 2026 03:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9410 |
| 2025-07-01 | 0.9437 |
| Capex total (greenfield) |
$1,033.76M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,691,983
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$4.00
Shown in table |
| Fuel cost / GJ default |
$4.50
Shown in table |
| Heat rate GJ/MWh default |
10.80
Shown in table |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex announcement for GSTONE4/Gladstone Power Station was found in the searched official and quasi-official sources. AEMO sources confirm the unit is part of the NEM generation information system, but the retrieved pages did not provide project cost, O&M, heat rate, fuel price, or emissions parameters for this specific unit. Because the user required source-backed research and the prompt forbids substituting benchmark capex when a plant-specific figure is not found, capex remains unset. AEMO 2024 technology-cost material was located for fallback benchmarking only, but not applied here because the instruction prioritises plant-specific reporting and the exact benchmark values for black coal subcritical were not extracted from the retrieved passages.