Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 03:30 → 14 Jun 2026 03:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9410 |
| 2025-07-01 | 0.9437 |
| Capex total (greenfield) |
$1,155.60M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
$108.65M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$4,127,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$35.67M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$127,389
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$18.20
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$10.24
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.80
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Gladstone Power Station was built by the Queensland Government and first commenced operation in 1976. A $42 million refurbishment program was completed in October 1988. No plant-specific greenfield investment figure from the owner/developer was found in the search results, so the reported construction cost from secondary sources was used for capex. O&M and performance inputs use AEMO/GHD black coal sub-critical benchmark values or server-side fallback where not explicitly visible in the retrieved excerpt.