Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9403 |
| 2025-07-01 | 0.9461 |
| Capex total (greenfield) |
$1,033.76M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$401.79M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$3,691,983
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$16.24M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$4.22
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$4.75
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
9.47
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No reliable source was found for original greenfield construction capex for GSTONE2/Gladstone Power Station in the searched materials. A plant history source confirms the station was built by the Queensland Government, first opened in September 1976, and later received a $42 million refurbishment in October 1988 and a $180 million capital works program after the 1994 sale. Heat rate uses AEMO's published Gladstone static heat rate (9.47 GJ/MWh).