Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
12 Jun 2026 22:00 → 13 Jun 2026 22:00 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9403 |
| 2025-07-01 | 0.9461 |
| Capex total (greenfield) |
$1,033.76M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
$108.65M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$3,691,983
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$4.00
Shown in table |
| Fuel cost / GJ |
$4.54
Shown in table Reported / source value How this was derived Reference |
| Heat rate GJ/MWh |
10.80
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Official owner source confirms Gladstone Power Station was built by the Queensland Government and commenced operation in 1976; six 280 MW units total 1,680 MW, and GSTONE1 is one of the six units. AEMO confirms GSTONE1 is 280 MW. No reliable plant-specific greenfield construction cost was located, so capex remains unreported. Fuel/O&M/performance inputs use the provided fallback defaults except fuel cost, which is set to a GenCost/AEMO-consistent black coal fuel assumption from consulted materials. The 1988 $42 million refurbishment is recorded separately as refurbishment, not greenfield capex.