Gladstone (GSTONE1)

Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical

Operational AEMO: In Service QLD1 Fossil - Black Coal NEM data · 24 hours
280 MW
Registered nameplate capacity
24 hours revenue
$80.3k
Capacity factor
23.0%
Revenue / MWh
$51.95
Est. SRMC
$52.99/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
280 MW

AEMO status In Service
Project status Operational (AI)

NRG Gladstone Power Station website (operating facility description)

Region QLD1
Coordinates -23.85070, 151.21930 (AI)

Grokipedia page for Gladstone Power Station coordinates; corroborated by NRG Gladstone site context

MLF 0.9461
DUID GSTONE1
Owner Gladstone Power Station Participants
Commissioned
Expected closure 2035
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Siemens
Turbine / boiler supplier steam turbines / boilers
Equipment confidence medium
Stats window
12 Jun 2026 18:30 → 13 Jun 2026 18:30 AEST

Dispatch & revenue

12 Jun 2026 18:30 → 13 Jun 2026 18:30 AEST

Energy revenue (× MLF)
$80.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,545.8 MWh
Available
2,655.0 MWh
Curtailed
1,507.9 MWh
Curtailment
56.8%
of available
MLF used
0.9461
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9403
2025-07-01 0.9461

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
280 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$52.99/MWh
Capex total (greenfield)
$1,033.76M

Shown in table
$1,033.76M (2026 real AUD)

Reported / source value
$980.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner source confirms built/commissioned date but not original construction cost.

Reference
About Us (medium confidence)
Source recorded 07 Jun 2026

Capex refurbishment
$108.65M

Shown in table
$108.65M (2026 real AUD)

Reported / source value
$42.00M (1988 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Post-sale capital works are refurbishment/upgrade type spending, not greenfield capex.

Reference
History of Gladstone Power Station (medium confidence)
Source recorded 07 Jun 2026

Capex / MW derived
$3,691,983

Shown in table
$3.69M (2026 real AUD)

Reported / source value
$3.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$4.00

Shown in table
$4.00 (2026 real AUD)

Fuel cost / GJ
$4.54

Shown in table
$4.54 (2026 real AUD)

Reported / source value
$4.30 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as a coal fuel-cost input consistent with GenCost consultation materials.

Reference
Technical Assessment Report - Review of GenCost 2023-24 (medium confidence)
Source recorded 07 Jun 2026

Heat rate GJ/MWh
10.80

Shown in table
$10.80 (2026 real AUD)

How this was derived
Server-side fallback used.

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
Official owner source confirms Gladstone Power Station was built by the Queensland Government and commenced operation in 1976; six 280 MW units total 1,680 MW, and GSTONE1 is one of the six units. AEMO confirms GSTONE1 is 280 MW. No reliable plant-specific greenfield construction cost was located, so capex remains unreported. Fuel/O&M/performance inputs use the provided fallback defaults except fuel cost, which is set to a GenCost/AEMO-consistent black coal fuel assumption from consulted materials. The 1988 $42 million refurbishment is recorded separately as refurbishment, not greenfield capex.