Girgarre Solar Farm (GIRGSF)

Solar · Giragarre Solar Farm Pty Ltd as trustee for Giragarre Solar Farm Trust · Solar PV - Single axis tracking

Commissioning AEMO: In Commissioning VIC1 Solar - Solar NEM data · 7 days
93 MW
Registered nameplate capacity
7 days revenue
$27.9k
Capacity factor
5.0%
Revenue / MWh
$35.38
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
93 MW

AEMO status In Commissioning
Project status Commissioning (AI)

PV Tech 2024: construction started Aug 2023 and 18-month build; project in commissioning around/after Mar 2025.

Region VIC1
Coordinates -36.37000, 145.99000 (AI)

Potentia Energy project page: located approximately 50 km west of Shepparton, Victoria; site inferred near Girgarre, VIC.

MLF 0.9441
DUID GIRGSF
Owner Giragarre Solar Farm Pty Ltd as trustee for Giragarre Solar Farm Trust
Commissioned Mar 2025
Expected closure 2054
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM First Solar
Module / inverter supplier PV modules / tracker plant supplier
Inverter OEM Ingeteam
Inverter model Ingecon Sun 3Power C Series
Equipment confidence medium
Stats window
06 Jun 2026 21:40 → 13 Jun 2026 21:40 AEST

Dispatch & revenue

06 Jun 2026 21:40 → 13 Jun 2026 21:40 AEST

Energy revenue (× MLF)
$27.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
789.4 MWh
Available
982.0 MWh
Curtailed
207.7 MWh
Curtailment
21.2%
of available
MLF used
0.9441
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-16 0.9477
2025-07-01 0.9463
2026-02-24 0.9441

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
93 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$152.84M

Shown in table
$152.84M (2026 real AUD)

Reported / source value
$140.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner/developer project page gives the plant-specific greenfield construction investment value and start year.

Reference
Girgarre Solar Farm - Potentia Energy (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$1,634,985

Shown in table
$1.63M (2026 real AUD)

Reported / source value
$1.50M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.18M

Shown in table
$1.18M (2026 real AUD)

Reported / source value
$1.12M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO solar PV benchmark fixed O&M for a utility-scale ground-mount solar project; used as fallback benchmark and scaled to site capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project-specific owner announcement states construction investment value of over A$140 million and commencement in 2023, with full operation expected in early 2025. AEMO/Aurecon solar PV benchmark used only for O&M fallback; no plant-specific O&M disclosure was found. Fixed O&M benchmark taken from AEMO 2024 solar PV report for a 40MW ground-mount project; scaled linearly to 93.48 MW AC capacity as fallback.

Sources