Girgarre Solar Farm (GIRGSF)

Solar · Giragarre Solar Farm Pty Ltd as trustee for Giragarre Solar Farm Trust · Solar PV - Single axis tracking

Commissioning AEMO: In Commissioning VIC1 Solar - Solar NEM data · 24 hours
93 MW
Registered nameplate capacity
24 hours revenue
$10.6k
Capacity factor
20.7%
Revenue / MWh
$22.77
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
93 MW

AEMO status In Commissioning
Project status Commissioning (AI)

PV Tech 2024: construction started Aug 2023 and 18-month build; project in commissioning around/after Mar 2025.

Region VIC1
Coordinates -36.37000, 145.99000 (AI)

Potentia Energy project page: located approximately 50 km west of Shepparton, Victoria; site inferred near Girgarre, VIC.

MLF 0.9210
DUID GIRGSF
Owner Giragarre Solar Farm Pty Ltd as trustee for Giragarre Solar Farm Trust
Commissioned Mar 2025
Expected closure 2054
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM First Solar
Module / inverter supplier PV modules / tracker plant supplier
Inverter OEM Ingeteam
Inverter model Ingecon Sun 3Power C Series
Equipment confidence medium
Stats window
24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

Dispatch & revenue

24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

Energy revenue (× MLF)
$10.6k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
465.4 MWh
Available
618.3 MWh
Curtailed
152.9 MWh
Curtailment
24.7%
of available
MLF used
0.9210
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-16 0.9477
2025-07-01 0.9463
2026-02-24 0.9441
2026-07-01 0.9210

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
93 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$152.84M

Shown in table
$152.84M (2026 real AUD)

Reported / source value
$140.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner/developer project page gives the plant-specific greenfield construction investment value and start year.

Reference
Girgarre Solar Farm - Potentia Energy (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
—
Capex / MW derived
$1,634,985

Shown in table
$1.63M (2026 real AUD)

Reported / source value
$1.50M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.18M

Shown in table
$1.18M (2026 real AUD)

Reported / source value
$1.12M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO solar PV benchmark fixed O&M for a utility-scale ground-mount solar project; used as fallback benchmark and scaled to site capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project-specific owner announcement states construction investment value of over A$140 million and commencement in 2023, with full operation expected in early 2025. AEMO/Aurecon solar PV benchmark used only for O&M fallback; no plant-specific O&M disclosure was found. Fixed O&M benchmark taken from AEMO 2024 solar PV report for a 40MW ground-mount project; scaled linearly to 93.48 MW AC capacity as fallback.