Solar · Giragarre Solar Farm Pty Ltd as trustee for Giragarre Solar Farm Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-16 | 0.9477 |
| 2025-07-01 | 0.9463 |
| 2026-02-24 | 0.9441 |
| Capex total (greenfield) |
$152.84M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,634,985
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.18M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific owner announcement states construction investment value of over A$140 million and commencement in 2023, with full operation expected in early 2025. AEMO/Aurecon solar PV benchmark used only for O&M fallback; no plant-specific O&M disclosure was found. Fixed O&M benchmark taken from AEMO 2024 solar PV report for a 40MW ground-mount project; scaled linearly to 93.48 MW AC capacity as fallback.