Ganymirra Solar Power Station

Solar · Edify Energy Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Edify Energy Pty Ltd
Commissioned —
Expected closure —
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

Dispatch & revenue

24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$474.68M

Shown in table
$474.68M (2026 real AUD)

Reported / source value
$450.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported project investment figure associated with the combined Ganymirra and Majors Creek developments.

Reference
Ganymirra and Majors Creek successful with Capacity Investment Scheme Agreements - Edify Energy (medium confidence)
Source recorded 07 Jun 2026

Capex refurbishment
—
Capex / MW
$3,164,557

Shown in table
$3.16M (2026 real AUD)

Reported / source value
$3.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived by dividing the reported combined project investment by the Ganymirra project capacity stated in the same source.

Reference
Ganymirra and Majors Creek successful with Capacity Investment Scheme Agreements - Edify Energy (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because no plant-specific variable OPEX was found.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Edify’s CIS announcement refers to the combined Ganymirra and Majors Creek projects and states they involve a $450m injection into local community, First Nations business, local employment and local supply chains. The source does not explicitly state this is the full greenfield plant capital cost, so capex is treated as the best available reported project investment figure for the combined hybrid development, not as a plant-only EPC cost. Capacity used for per-MW calculation is the combined 150 MW Ganymirra share referenced by Edify, yielding $3.0m/MW. No plant-specific fixed OPEX or specific greenfield capex for Ganymirra alone was found; variable OPEX fallback used.

Sources