Fulham Solar Farm And BESS

Solar · Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) · Solar PV - Single axis tracking

Development AEMO: Committed Solar - Solar NEM data · 30 days
101 MW
Registered nameplate capacity
Est. SRMC
$0.00/MWh
Key information
Capacity
101 MW

AEMO status Committed
Project status Development (AI)

Coordinates

DUID
Owner Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust)
Commissioned Jan 2028
Expected closure 2063
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
15 May 2026 01:35 → 14 Jun 2026 01:35 AEST

Dispatch & revenue

15 May 2026 01:35 → 14 Jun 2026 01:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
101 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$327.77M

Shown in table
$327.77M (2026 real AUD)

Reported / source value
$319.90M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Owner/developer reported project value at financial close; used as reported capex proxy because no more precise plant-specific figure was found.

Reference
Octopus Australia begins construction of its Fulham Solar Farm and Battery Project (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW derived
$3,251,651

Shown in table
$3.25M (2026 real AUD)

Reported / source value
$3.17M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived by dividing the reported project value proxy by the user-provided capacity.

Reference
Octopus Australia begins construction of its Fulham Solar Farm and Battery Project (medium confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
$1.24M

Shown in table
$1.24M (2026 real AUD)

Reported / source value
$960.0k (2025 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$12,295

Shown in table
$12.3k (2026 real AUD)

Reported / source value
$12.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as the nearest source-backed operating assumption for utility-scale solar PV with tracking when project-specific O&M was unavailable.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon solar PV review indicates variable O&M is included within fixed O&M for the modeled project.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 06 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Capex is based on Octopus Australia's reported financial close and construction commencement value of 'over $300m' for the 80MW/128MWh Fulham Solar Farm and Battery project. The site-specific source did not give a more precise amount; therefore capex_total_aud is recorded as the reported lower-bound proxy of $300m and capex_per_mw_aud is calculated on the registered 100.8MW site capacity provided by the user. The project website currently describes the project as 80MW solar with up to 128MWh battery storage, so the user-provided 100.8MW capacity may reflect a different registry basis or updated AC/DC rating; this should be reviewed.

Sources