Wind · Flyers Creek Wind Farm Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
07 Jun 2026 04:45 → 14 Jun 2026 04:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0205 |
| 2025-07-01 | 1.0278 |
| Capex total (greenfield) |
$382.10M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,625,368
Shown in table Reported / source value How this was derived |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific total cost of roughly A$350 million was stated in Flyers Creek Wind Farm CCC minutes in April 2023; this was used in preference to AEMO benchmarks for greenfield capex. The asset was committed to construction in February 2022 and was operational by 2024. No reliable plant-specific fixed O&M, heat rate, or fuel cost applies to wind; variable O&M default retained from server-side fallback only. AEMO/CSIRO onshore wind technical life guidance indicates 25-year design life, with some investors assuming 30-35 years; 25 years used here as the conservative default.