Eraring (ER04)

Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical

Closed AEMO: In Service - Announced Withdrawal (Permanent) NSW1 Fossil - Black Coal NEM data · 7 days
720 MW
Registered nameplate capacity
7 days revenue
$8.17M
Capacity factor
83.2%
Revenue / MWh
$81.19
Est. SRMC
$55.48/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
720 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

Origin Energy Eraring Power Station page (originenergy.com.au) describes the station as existing coal-fired generator units in service; 2024–2025 news reports discuss closure timing but not a new build.

Region NSW1
Coordinates -33.06193, 151.51975 (AI)

FindLatitudeAndLongitude.com lists Eraring Power Station at 5 Foreshore Street, Eraring NSW 2264 as -33.061932, 151.519747.

MLF 0.9854
DUID ER04
Owner Origin Energy Eraring Pty Ltd
Commissioned
Expected closure 2027
Closure date 19 Aug 2027
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Doosan Enerbility
Turbine / boiler supplier Steam turbine / boiler supplier
Equipment confidence medium
Stats window
06 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Dispatch & revenue

06 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Energy revenue (× MLF)
$8.17M
FCAS revenue (× MLF)
$998
FCAS volume
3,651.4 MWh
Dispatched
100,669.7 MWh
Available
106,251.7 MWh
Curtailed
8,092.3 MWh
Curtailment
7.6%
of available
MLF used
0.9854
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9855
2025-07-01 0.9854

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
720 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$55.48/MWh
Capex total (greenfield)
$2,581.97M

Shown in table
$2,581.97M (2026 real AUD)

Reported / source value
$3.50M (2025 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
AEMO/CSIRO ETC capex benchmark for black coal sub-critical turbine (existing generator/ETC mapping) was not retrieved from the sources in this run; internal server-side default used.

Capex refurbishment

How this was derived
No reliable official refurbishment/upgrades cost source extracted for ER04 in retrieved results.

Capex / MW derived
$3,586,066

Shown in table
$3.59M (2026 real AUD)

Reported / source value
$3.50M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$41.77M

Shown in table
$41.77M (2026 real AUD)

Reported / source value
$39.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No AEMO retirement O&M estimate table values for the exact technology mapping (black coal sub-critical turbine, existing) were extracted in retrieved sources; internal server-side default applied.

Variable OPEX / MWh
$4.22

Shown in table
$4.22 (2026 real AUD)

Reported / source value
$4.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No extracted AEMO variable O&M value for the exact mapping; internal server-side default applied.

Fuel cost / GJ
$4.75

Shown in table
$4.75 (2026 real AUD)

Reported / source value
$4.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
10.80

Shown in table
$10.80 (2026 real AUD)

How this was derived
AEMO heat-rate dataset lists Eraring static heat rate 9.55 GJ/MWh (HHV).

Reference
Heat rates Encapsulates the efficiency of thermal generators (as-generated, HHV) - AEMO heat rate data (includes Eraring) (medium confidence)
Source recorded 04 Jun 2026

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
Web search returned AEMO heat-rate data for Eraring (existing generator) showing a static heat rate of 9.55 GJ/MWh, but not the required AEMO/CSIRO ETC capex benchmark for black coal sub-critical turbine, nor an AEMO/CSIRO fuel-cost parameter and refurbishment-cost data for ER04 specifically. Therefore capex and O&M/fuel/performance fields use the provided internal technology defaults (server-side). Commissioning/online date and any refurbishment/upgrades were not reliably sourced from official Origin/AEMO documents in the retrieved results.

Sources