Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
07 Jun 2026 05:40 → 14 Jun 2026 05:40 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9855 |
| 2025-07-01 | 0.9846 |
| Capex total (greenfield) |
$2,658.23M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,691,983
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$46.59M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$64,706
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$9.34
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$4.96
Shown in table Reported / source value How this was derived Reference |
| Heat rate GJ/MWh |
10.11
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Eraring is an existing black-coal steam station; the available source evidence did not provide a plant-specific original construction capex figure. AEMO/Aurecon 2024 cost review indicates Australian coal-fired units are typically subcritical or supercritical, and the coal case uses a net heat rate of 10.108 GJ/MWh HHV for the selected project. The fixed O&M value used here is the 2024 escalated benchmark for the black coal case from the AEMO/Aurecon review, multiplied by the unit's 720 MW capacity.