Eraring (ER01)

Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical

Closed AEMO: In Service - Announced Withdrawal (Permanent) NSW1 Fossil - Black Coal NEM data · 2h
720 MW
Registered nameplate capacity
2h revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$48.29/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
720 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

Origin Energy Eraring Power Station page (originenergy.com.au) describes the station as an operating coal-fired generator unit site; Power Technology 2024 likewise says the project is currently active.

Region NSW1
Coordinates -33.06193, 151.51975 (AI)

FindLatitudeAndLongitude.com listing for Eraring Power Station, 5 Foreshore Street, Eraring NSW 2264, Australia.

MLF 0.9846
DUID ER01
Owner Origin Energy Eraring Pty Ltd
Commissioned
Expected closure 2027
Closure date 19 Aug 2027
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Doosan Enerbility
Turbine / boiler supplier Steam turbine / boiler
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 01:35 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 01:35 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9846
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9855
2025-07-01 0.9846

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
720 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$48.29/MWh
Capex total (greenfield)
$2,581.97M

Shown in table
$2,581.97M (2026 real AUD)

Reported / source value
$2,520.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Confirms build period only; no cost figure is given in the source.

Reference
Eraring Power Station | Heritage NSW (low confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$3,586,066

Shown in table
$3.59M (2026 real AUD)

Reported / source value
$3.50M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$46.62M

Shown in table
$46.62M (2026 real AUD)

Reported / source value
$45.44M (2025 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$64,754

Shown in table
$64.8k (2026 real AUD)

Reported / source value
$63.2k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the large black coal benchmark as the closest available published operating proxy.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$8.20

Shown in table
$8.20 (2026 real AUD)

Reported / source value
$8.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark variable O&M for black coal.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ default
$4.50

Shown in table
$4.50 (2026 real AUD)

Heat rate GJ/MWh
8.91

Shown in table
$8.91 (2026 real AUD)

How this was derived
AEMO heat-rate table lists Eraring's incremental heat rate at 8.91 GJ/MWh.

Reference
Heat rates (high confidence)
Source recorded 07 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
Eraring is a 2,880 MW coal-fired power station; no plant-specific greenfield construction cost was found in the searched official sources, so no capex figure is reported. Used AEMO/GHD black coal super-critical O&M estimates as the closest published benchmark for an operating coal unit, and AEMO heat-rate data listing Eraring at 8.91 GJ/MWh incremental heat rate. Eraring construction began in 1976 and the first unit was commissioned in March 1982; however, no original build cost was identified in the sources searched. The NSW Government agreement indicates Eraring is expected to cease operation by no later than 30 April 2029, but that is an operating/closure note, not capex.

Sources