Solar · Lighthouse Infrastructure Management Limited · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9331 |
| 2025-07-01 | 0.9381 |
| Capex total (greenfield) |
$98.73M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table How this was derived |
| Variable OPEX / MWh default |
$0.25
Shown in table How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
I could verify the project is a 72 MW AC single-axis tracking solar park owned by a Lighthouse Infrastructure subsidiary and commissioned in early 2019, but I did not find a reliable plant-specific greenfield capex figure in the searched owner/government/project sources. Use further owner financial-close documentation or annual reports if a precise original investment amount is required. No refurbishment cost identified.