Wind · Northleaf /InfraRed/Macquarie Capital · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
14 May 2026 22:30 → 13 Jun 2026 22:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9475 |
| 2025-07-01 | 0.9569 |
| Capex total (greenfield) |
$194.01M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No reliable project-specific greenfield capex announcement was found for Elaine Wind Farm itself. The asset is part of the Lal Lal Wind Farms complex (Elaine 84 MW + Yendon 144 MW), but available sources identified ownership, capacity and operational status rather than total construction cost. As a fallback, the wind OPEX value from AEMO/Aurecon 2024 technical parameter review is not fully extracted here due to ambiguity in the retrieved lines; fixed OPEX should be reviewed against the source before use.