Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 14:05 → 13 Jun 2026 14:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9912 |
| 2025-07-01 | 0.9945 |
| Capex total (greenfield) |
$284.81M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield construction or investment cost for Eildon was found in official owner/government sources during search. AGL currently lists Eildon Power Station at 120 MW with average annual output about 184 GWh and notes the site lease commenced in November 1996; AGL does not provide a commissioning year on the hydro station page. Because no reported plant-specific capex was located, capex fields remain null rather than using a benchmark estimate. Eildon is an existing hydro asset within AGL's hydro portfolio, so refurbishment/upgrade costs would require a separate verified source if needed.