Edenvale Solar Park (EDENVSF1)

Solar · Edenvale Solar Park Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 20h
180 MW
Registered nameplate capacity
20h revenue
$3.4k
Capacity factor
5.8%
Revenue / MWh
$16.00
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
180 MW

AEMO status In Service
Project status Operational (AI)

Edenvale Solar Park website, 2024-03-01 COD announcement; pv magazine Australia, 2023-10-03, reports the 204 MW project reached rated output and was opened.

Region QLD1
Coordinates -26.93200, 150.58190 (AI)

Global Energy Monitor / Queensland electricity generation map coordinates for Edenvale Solar Park (exact site).

MLF 0.9823
DUID EDENVSF1
Owner Edenvale Solar Park Pty Ltd
Commissioned Mar 2024
Expected closure 2053
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Gransolar
Module / inverter supplier module/inverter supplier
Inverter OEM
Inverter model
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 20:15 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 20:15 AEST

Energy revenue (× MLF)
$3.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
209.5 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9823
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9707
2025-07-01 0.9823

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
180 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$211.44M

Shown in table
$211.44M (2026 real AUD)

Reported / source value
$170.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Council report lists Edenvale Solar Park as a 204 MW solar farm with $170 million construction cost.

Reference
Western Downs Development Status Report 2024 (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$1,174,682

Shown in table
$1.17M (2026 real AUD)

Reported / source value
$944.4k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW capex is calculated from the reported project construction cost and capacity.

Reference
Western Downs Development Status Report 2024 (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$2.28M

Shown in table
$2.28M (2026 real AUD)

Reported / source value
$2.45M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Annual fixed O&M is scaled from the benchmark using plant capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon benchmark provides utility-scale solar PV fixed O&M.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon indicates no separate variable O&M for utility-scale solar PV.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific construction cost found in a Queensland government development status report: $170 million construction cost for Edenvale Solar Park (204 MW). The project owner/developer pages confirm the asset is a 204 MW solar farm and that it uses single-axis tracking; O&M benchmark taken from AEMO/Aurecon 2024 review for utility-scale solar PV. Construction commenced in 2021 and commercial operation was announced in 2023, so capex_year is set to 2021 as the construction start year in the source trail. No refurbishment cost identified. Emissions intensity is zero for solar PV. Asset life uses the AEMO/Aurecon utility-scale solar PV indicative technical life.

Sources