Dundonnell Wind Farm (DUNDWF3)

Wind · Tilt Renewables · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 3h
122 MW
Registered nameplate capacity
3h revenue
$1.0k
Capacity factor
4.4%
Revenue / MWh
$62.76
Est. SRMC
$0.53/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
122 MW

AEMO status In Service
Project status Operational (AI)

Wikipedia/Power Technology cite Dundonnell Wind Farm completed and commissioned in 2020/2022; now in commercial service (wikipedia.org, power-technology.com)

Region VIC1
Coordinates -37.86700, 142.96700 (AI)

Wikipedia coordinates for Dundonnell Wind Farm: 37°52′S 142°58′E (wikipedia.org)

MLF 0.9845
DUID DUNDWF3
Owner Tilt Renewables
Commissioned Jun 2022
Expected closure 2045
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V150-4.2
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 02:50 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 02:50 AEST

Energy revenue (× MLF)
$1.0k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
15.9 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9845
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9810
2025-07-01 0.9845

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
122 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$740.74M

Shown in table
$740.74M (2026 real AUD)

Reported / source value
$560.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official Victorian Government source states Dundonnell Wind Farm was a $560 million project and that it received a support agreement in late 2018.

Reference
Investment opportunities (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$6,081,615

Shown in table
$6.08M (2026 real AUD)

Reported / source value
$4.60M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived by dividing the reported total project cost by the user-provided DUID capacity of 121.8 MW.

Reference
Investment opportunities (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$7.07M

Shown in table
$7.07M (2026 real AUD)

Reported / source value
$6.70M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived annual fixed OPEX using the fallback per-MW assumption and the provided capacity.

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal default used because no project-specific O&M source was found.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal default used because no project-specific variable O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project-specific greenfield capex was found from the Victorian Government: the Dundonnell Wind Farm was a $560 million project under VRET1. This figure is used instead of AEMO benchmark capex. The project is 336 MW overall; capex has been normalised to the provided 121.8 MW DUID capacity for capex_per_mw_aud. No separate refurbishment cost was found.

Sources