Wind · Tilt Renewables · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
15 May 2026 06:00 → 14 Jun 2026 06:00 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9810 |
| 2025-07-01 | 0.9845 |
| Capex total (greenfield) |
$740.74M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$16,033,349
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$3.36M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$72,751
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.66
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific reported greenfield construction cost found for the 336 MW Dundonnell Wind Farm: A$560 million. Capacity-based capex computed from reported total and registered capacity. No plant-specific refurbishment cost found. Fixed OPEX used server fallback because no project-specific operating cost source was located in the search results. Asset life assumed at 30 years for onshore wind.