Wind · Dulacca Energy Project Co Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 01:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9770 |
| 2025-07-01 | 0.9853 |
| Capex total (greenfield) |
$401.45M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield construction cost was found in official owner/developer/government sources from the searches run. Owner/developer materials confirm the project is a 180 MW onshore wind farm and that it was owned by Octopus Investments Australia after acquisition from RES, but they do not disclose total project CAPEX. Using only the provided fallback operating defaults for variable OPEX and emissions; fixed OPEX, heat rate, fuel cost, and plant-specific capex remain unverified. Asset life assumed at 30 years based on RES project materials.