Dugald River Wind Faarm

Wind · MMG · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 30 days
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner MMG
Commissioned —
Expected closure —
Closure date —
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM —
Turbine model —
Stats window
26 Aug 2026 04:25 → 25 Sep 2026 04:25 AEST

Dispatch & revenue

26 Aug 2026 04:25 → 25 Sep 2026 04:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
—
Capex refurbishment
—
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
MMG has publicly stated it is investigating the feasibility of building a wind farm at Dugald River, but the available sources do not provide a plant-specific greenfield construction cost, capacity, or commissioning date. The EPBC referral indicates a proposed project of up to 24 x 6 MW wind turbine generators (up to 144 MW) with ancillary infrastructure, but no capital cost figure was found in the accessible public documents. Internal technology defaults were used only for fallback operating assumptions.