Gas Peakers · Synergen Power Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
07 Jun 2026 08:35 → 14 Jun 2026 08:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9998 |
| 2025-07-01 | 0.9988 |
| Capex total (greenfield) |
$77.61M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,492,537
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$4.73M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$90,873
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$5.82
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$14.93
Shown in table Reported / source value |
| Heat rate GJ/MWh |
13.69
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Dry Creek GT / DRYCGT3 in the searches performed, so capex remains unverified. O&M and heat-rate values were sourced from AEMO/Aurecon benchmark and AEMO heat-rate materials. Dry Creek GT is listed as 156 MW across the full station, but DRYCGT3 is a 52 MW unit; O&M fixed annual cost was calculated from the fallback per-MW assumption times 52 MW.