Gas Peakers · Synergen Power Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 01:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9998 |
| 2025-07-01 | 0.9988 |
| Capex total (greenfield) |
$65.82M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.47M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$47,468
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$2.64
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Dry Creek GT is a 156 MW OCGT station at Dry Creek, South Australia, with three 52 MW units registered to Synergen Power. I did not find a plant-specific greenfield construction/investment cost for DRYCGT2 in the searched official/primary sources, so capex remains unfilled rather than inferred from benchmarks. O&M and performance fields use the provided fallback defaults.