Wind · Spark Renewables Pty Ltd · Wind Turbine - Onshore
13 Jun 2026 16:25 → 14 Jun 2026 16:25 AEST
| Capex total (greenfield) |
$935.70M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
I found official Spark Renewables material confirming the Dinawan Energy Hub is a hybrid wind, solar and battery project, and that the wind component is 707 MW under access rights / 357 MW for Stage 1 in CIS material. However, I did not find a project-specific greenfield construction cost for the wind DUID/site. The only plant-specific capital figure found was for the separate Dinawan Solar Farm + BESS CIV estimate ($1.348bn excl. GST), which should not be used for this wind generator. In the absence of a wind-project-specific capex figure, no capex estimate has been populated. Operational assumptions were not separately sourced beyond generic onshore-wind benchmark direction from GenCost/AEMO, so they are left blank pending further review.