Dinawan Energy Hub

Solar · Spark Renewables Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
300 MW
Researched capacity
Est. SRMC
$0.25/MWh
Key information
Capacity (AI)
300 MW

AEMO/NEM spreadsheet entry for Dinawan Energy Hub lists 300.00 MW; no separate reliable public source for a different announced capacity was found in the provided results.

AEMO status Publicly Announced
Project status Development (AI)

Owner/project references describe Dinawan Energy Hub as a proposed/publicly announced project with a future commissioning date of 2030-12-01, indicating pre-construction development phase.

Coordinates

DUID
Owner Spark Renewables Pty Ltd
Commissioned Mar 2031
Expected closure 2060
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
12 Jun 2026 18:15 → 13 Jun 2026 18:15 AEST

Dispatch & revenue

12 Jun 2026 18:15 → 13 Jun 2026 18:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
300 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$1,350.00M

Shown in table
$1,350.00M (2026 real AUD)

Reported / source value
$1,350.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official planning determination states the project EDC is $1.35 billion.

Reference
Statement of Reasons for Dinawan Solar Farm (SSD-50725959) (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$4,500,000

Shown in table
$4.50M (2026 real AUD)

Reported / source value
$4.50M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Computed from the official reported project cost and the user-specified 300 MW capacity.

Reference
Statement of Reasons for Dinawan Solar Farm (SSD-50725959) (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$6.00M

Shown in table
$6.00M (2026 real AUD)

Reported / source value
$6.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$20,000

Shown in table
$20.0k (2026 real AUD)

Reported / source value
$20.0k (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal default used due to no project-specific operating cost source found.

Variable OPEX / MWh
$0.25

Shown in table
$0.25 (2026 real AUD)

Reported / source value
$0.25 (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal default used due to no project-specific variable O&M source found.

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific planning/approval sources indicate an estimated development cost of $1.35 billion for the Dinawan Solar Farm element of the broader Dinawan Energy Hub. The figure appears to cover the ~800 MW solar farm plus 356 MW/1,574 MWh BESS, so it likely overstates the 300 MW solar-only allocation used here; capex_per_mw is therefore a simple allocation of the reported project cost to the 300 MW unit and should be treated cautiously. No separate owner-reported greenfield capex for the 300 MW solar tranche was found in search results.

Sources