Hydro · Hydro-Electric Corporation · Hydro - Dam
Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.
07 Jun 2026 06:10 → 14 Jun 2026 06:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9628 |
| 2025-07-01 | 0.9616 |
| Capex total (greenfield) |
$253.16M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Devils Gate was commissioned in 1969 and Hydro Tasmania describes it as a 63 MW Francis-turbine hydro station; AEMO records DEVILS_G as a 1 x 60 MW hydro unit. I found no reliable plant-specific greenfield construction cost or refurbishment cost in the searched official sources, so capex remains unfilled. A 2018 modernisation is mentioned by Hydro Tasmania, but no cost was stated in the accessible fact sheet, so no refurbishment amount is recorded. O&M values were not located in plant-specific or benchmark sources during this search, so they remain null.