Solar · Pacific Hydro Australia Developments Pty Ltd · Solar PV - Single axis tracking
14 May 2026 23:45 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
$137.13M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.11M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$21,097
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 07 Jun 2026
Notes
No plant-specific greenfield project cost could be verified from owner/developer or government sources in the searched material. Solar PV single-axis tracking was confirmed from NSW planning documents. CAPEX and OPEX therefore use internal benchmark defaults as a fallback; capex_basis is estimated, not reported. Project approval was dated 04/06/2024 and the site is described as a 100 MW solar farm with energy storage and associated infrastructure.