Solar · Darlington Point Solar Farm Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 17:10 → 13 Jun 2026 17:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8439 |
| 2025-07-01 | 0.8854 |
| Capex total (greenfield) |
$595.24M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,164,738
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$7.27M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$26,455
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.33
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Greenfield project construction was financed at more than $450 million in December 2018. Site approval documents identify the project as a 275 MW solar farm with a 100 MWh BESS in the original consent, but the capex figure sourced here is for the solar farm project financing announcement and is treated as the project-level construction cost for the generator. Fixed O&M uses the provided fallback default of $20,000/MW-year; annual fixed O&M implied at 274.97 MW is about $5.5 million. No plant-specific O&M, fuel, heat-rate, or emissions data beyond zero direct emissions for solar PV were found in the searched sources.