Cullerin Range Wind Farm (CULLRGWF)

Wind · Cullerin Range Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service NSW1 Wind - Wind NEM data · 7 days
30 MW
Registered nameplate capacity
7 days revenue
$25.9k
Capacity factor
7.3%
Revenue / MWh
$70.48
Est. SRMC
$0.68/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
30 MW

AEMO status In Service
Project status Operational (AI)

EDL project page states the wind farm has been operational since July 2009 and is in service at 30 MW (edlenergy.com, accessed 2026).

Region NSW1
Coordinates -34.83200, 149.38000 (AI)

EDL project page gives location near Gunning / North Cullerin NSW; project pages and mapping place the wind farm on the Cullerin Range near Gunning (edlenergy.com; Wikipedia).

MLF 0.9521
DUID CULLRGWF
Owner Cullerin Range Wind Farm Pty Ltd
Commissioned
Expected closure 2038
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Senvion
Turbine model MM82 / MM92-2.05
Equipment confidence high
Stats window
06 Jun 2026 19:55 → 13 Jun 2026 19:55 AEST

Dispatch & revenue

06 Jun 2026 19:55 → 13 Jun 2026 19:55 AEST

Energy revenue (× MLF)
$25.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
367.9 MWh
Available
MWh
Curtailed
0.9 MWh
Curtailment
of available
MLF used
0.9521
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9317
2025-07-01 0.9521

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
30 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.68/MWh
Capex total (greenfield)
$95.30M

Shown in table
$95.30M (2026 real AUD)

Reported / source value
$69.00M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as the plant-specific greenfield construction cost for the 30 MW site.

Reference
DUET Group Interim Financial Report 2017 (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$3,176,796

Shown in table
$3.18M (2026 real AUD)

Reported / source value
$2.30M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from the reported project cost and registered capacity.

Reference
DUET Group Interim Financial Report 2017 (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.68

Shown in table
$0.68 (2026 real AUD)

Reported / source value
$0.50 (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback retained because no plant-specific wind O&M benchmark was verified in the retrieved sources.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific construction cost was found in DUET/EDL materials describing estimated total construction costs of $69 million for the 30 MW Cullerin acquisition/project, operational by June 2017. This is used as the reported greenfield capex proxy for the site; no separate refurbishment cost was found. O&M and technical defaults for wind were not directly sourced in the available results, so only the internal variable O&M fallback is retained.