142 MW
Registered nameplate capacity
7 days revenue
$220.9k
Capacity factor
13.2%
Revenue / MWh
$70.05
Est. SRMC
$0.53/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
142 MW

AEMO status In Service
Project status Operational (AI)

Squadron Energy project page (2022): the wind project became fully operational in 2022.

Region NSW1
Coordinates -32.96600, 149.63600 (AI)

Wikipedia coordinates for Crudine Ridge Wind Farm: 32°57′58″S 149°38′10″E (-32.966, 149.636).

MLF 0.9409
DUID CRURWF1
Owner CRWF Nominees Pty Ltd as trustee of the CRWF Trust
Commissioned Jun 2022
Expected closure 2041
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM GE
Turbine model 3.6-137
Equipment confidence high
Stats window
07 Jun 2026 06:20 → 14 Jun 2026 06:20 AEST

Dispatch & revenue

07 Jun 2026 06:20 → 14 Jun 2026 06:20 AEST

Energy revenue (× MLF)
$220.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,153.4 MWh
Available
3,117.6 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9409
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9280
2025-07-01 0.9409

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
142 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$330.69M

Shown in table
$330.69M (2026 real AUD)

Reported / source value
$250.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official CEFC case study states the project cost was $250 million in 2018 nominal terms.

Reference
Large energy users tap into Crudine Ridge Wind Farm (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$2,333,553

Shown in table
$2.33M (2026 real AUD)

Reported / source value
$1.76M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex per MW using reported total project cost and the user-supplied registered capacity of 141.71 MW.

Reference
Large energy users tap into Crudine Ridge Wind Farm (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$8.22M

Shown in table
$8.22M (2026 real AUD)

Reported / source value
$7.82M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M source was located in the web search, so the provided internal fallback was used.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source was located in the web search, so the provided internal fallback was used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific greenfield capex was found from CEFC: $250 million for Crudine Ridge Wind Farm in 2018. Capacity used for capex normalization is 141.71 MW per user input, yielding about $1.76m/MW. Fixed O&M used server-side fallback because no plant-specific O&M figure was found in the searched sources. Onshore wind design life is typically around 30 years in AEMO/Aurecon technical review.