Crookwell 3 Wind Farm (CROOKWF3)

Wind · Crookwell 3 Development Pty Ltd · Wind Turbine - Onshore

Commissioning AEMO: In Commissioning NSW1 Wind - Wind NEM data · 1h
58 MW
Registered nameplate capacity
1h revenue
$1.1k
Capacity factor
26.1%
Revenue / MWh
$74.00
Est. SRMC
$0.76/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
58 MW

AEMO status In Commissioning
Project status Commissioning (AI)

AEMO registration status provided as In Commissioning; project website shows construction progress and turbine supplier materials shipped (Global Power Generation Australia, site pages 2024/2025).

Region NSW1
Coordinates

Site location described on the project page as Crookwell, 25km north-west of Goulburn, NSW (globalpower-generation.com.au).

MLF 0.9620
DUID CROOKWF3
Owner Crookwell 3 Development Pty Ltd
Commissioned Nov 2024
Expected closure 2054
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V126-3.6MW
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 01:25 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 01:25 AEST

Energy revenue (× MLF)
$1.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
15.0 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9620
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9588
2025-07-01 0.9620

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
58 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.76/MWh
Capex total (greenfield)
$147.93M

Shown in table
$147.93M (2026 real AUD)

Reported / source value
$100.00M (2012 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Planning report for Crookwell 3 states a total estimated project cost of $90m-$110m in nominal 2012 terms.

Reference
Microsoft Word - 20111125 - Crookwell 3, Revised Socio-Economic Report.doc (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$2,568,212

Shown in table
$2.57M (2026 real AUD)

Reported / source value
$1.74M (2012 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated midpoint capex per MW using the planning-stage project cost and registered capacity.

Reference
Microsoft Word - 20111125 - Crookwell 3, Revised Socio-Economic Report.doc (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$4.80M

Shown in table
$4.80M (2026 real AUD)

Reported / source value
$3.17M (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$83,333

Shown in table
$83.3k (2026 real AUD)

Reported / source value
$55.0k (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M data located; fallback default applied.

Variable OPEX / MWh
$0.76

Shown in table
$0.76 (2026 real AUD)

Reported / source value
$0.50 (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M data located; fallback default applied.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project-specific greenfield capex was not found in recent owner/government announcements; the only project-specific cost located was an early planning-stage estimate of $90m-$110m in 2012 nominal dollars. O&M and technical assumptions fall back to internal defaults because no plant-specific operating data was found.

Sources