Wind · Crookwell 3 Development Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
15 May 2026 03:10 → 14 Jun 2026 03:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9588 |
| 2025-07-01 | 0.9620 |
| Capex total (greenfield) |
$147.93M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,568,212
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$4.80M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$83,333
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.76
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific greenfield capex was not found in recent owner/government announcements; the only project-specific cost located was an early planning-stage estimate of $90m-$110m in 2012 nominal dollars. O&M and technical assumptions fall back to internal defaults because no plant-specific operating data was found.