Corowa Solar Farm (CRWASF1)

Solar · Corowa Operationsco Pty Ltd as trustee for Corowa Operations Trust · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 7 days
36 MW
Registered nameplate capacity
7 days revenue
$30.4k
Capacity factor
9.0%
Revenue / MWh
$56.19
Est. SRMC
$0.33/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
36 MW

AEMO status In Service
Project status Operational (AI)

Global Energy Monitor wiki and NSW Planning Portal indicate the Corowa Solar Farm is operating / in service (gem.wiki; planningportal.nsw.gov.au).

Region NSW1
Coordinates

MLF 0.9345
DUID CRWASF1
Owner Corowa Operationsco Pty Ltd as trustee for Corowa Operations Trust
Commissioned Sep 2021
Expected closure 2051
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
07 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

Dispatch & revenue

07 Jun 2026 07:35 → 14 Jun 2026 07:35 AEST

Energy revenue (× MLF)
$30.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
541.7 MWh
Available
542.1 MWh
Curtailed
0.4 MWh
Curtailment
0.1%
of available
MLF used
0.9345
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8979
2025-07-01 0.9355
2026-04-21 0.9345

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
36 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.33/MWh
Capex total (greenfield)
$38.85M

Shown in table
$38.85M (2026 real AUD)

Reported / source value
$29.37M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
NSW planning approval lists the Corowa Solar Farm capital investment value at $29,367,788 in 2018 nominal terms.

Reference
Corowa Solar Farm | Planning Portal - Department of Planning and Environment (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$1,078,764

Shown in table
$1.08M (2026 real AUD)

Reported / source value
$815.5k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex per MW using the user-supplied registered capacity of 36.01 MW.

Reference
Corowa Solar Farm | Planning Portal - Department of Planning and Environment (medium confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$952.6k

Shown in table
$952.6k (2026 real AUD)

Reported / source value
$720.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M derived from the internal default and user-supplied capacity.

Fixed OPEX / MW-yr
$26,455

Shown in table
$26.5k (2026 real AUD)

Reported / source value
$20.0k (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M source was found; internal fallback used.

Variable OPEX / MWh
$0.33

Shown in table
$0.33 (2026 real AUD)

Reported / source value
$0.25 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source was found; internal fallback used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific capital investment value was found in NSW Planning Portal for a 27 MWAC Corowa Solar Farm approval; the registered DUID capacity provided by the user is 36.01 MW, so the per-MW figure is normalized using the user-supplied capacity. No separate refurbishment cost identified. O&M values use the provided internal defaults as no plant-specific operating cost source was found.

Sources