21 Jul 2026 18:35 → 22 Jul 2026 18:35 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Akaysha states Connewarren BESS is a proposed 1,000 MW / 4,000 MWh battery near Mortlake, Victoria, but no plant-specific greenfield capex or financing amount was found in the searched official/primary sources. Because no reported project cost was located, capex fields are left null rather than using a benchmark. No operating cost, efficiency, or asset-life assumptions were found from project-specific sources; only the zero-emissions nature of battery storage is populated as a technology default.