Other Generators · Cape Byron Management PTY LTD · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 17:20 → 13 Jun 2026 17:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9510 |
| 2025-07-01 | 0.8811 |
| Capex total (greenfield) |
$142.41M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
How this was derived Reference |
| Capex / MW derived |
$4,746,835
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$70,000
Shown in table |
| Variable OPEX / MWh default |
$5.00
Shown in table |
| Fuel cost / GJ default |
$8.00
Shown in table |
| Heat rate GJ/MWh |
13.39
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Commissioned in 2008. Owner says the site was purchased in November 2013 and has since had 'millions' invested in capital works improvements. AEMO heat-rate benchmark for new biomass is 13.39 GJ/MWh. Fuel/emissions values are fallback defaults and should be reviewed if plant-specific operating data becomes available.