Solar · Luminous Energy · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
15 May 2026 05:40 → 14 Jun 2026 05:40 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9718 |
| 2025-07-01 | 0.9865 |
| Capex total (greenfield) |
$307.69M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,416,305
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$5.57M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$25,641
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.32
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific greenfield construction cost reported by Luminous Energy as a $240 million deal for the site, completed at end-2022. Using the reported deal value as nominal 2020 construction cost year/announcement year. Fixed O&M was not found for this specific plant; fallback solar tracking O&M default used. Asset life set to 40 years based on AEMO utility-scale solar farm assumptions.