Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
22 Jul 2026 22:05 → 23 Jul 2026 22:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9828 |
| 2025-07-01 | 0.9849 |
| 2026-07-01 | 0.9792 |
| Capex total (greenfield) |
$307.68M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,699,898
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$51.78M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$286,078
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$18.35
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$16.76
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
No plant-specific greenfield construction cost was located in the searched owner/government sources. The available reported figure is Snowy Hydro's 30 January 2015 acquisition consideration for Colongra, which is not the original build capex. O&M and technical assumptions fall back to AEMO/Aurecon review values for gas turbine technologies.