Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 16:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9828 |
| 2025-07-01 | 0.9849 |
| Capex total (greenfield) |
$229.11M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$35.15M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$194,182
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$11.33
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Plant-specific greenfield capex for Colongra/CG3 was not found in searched owner/government/AEMO sources. O&M and performance values were taken from AEMO/Aurecon 2024 technology review for OCGT-type gas turbines. Colongra is described by Snowy Hydro as a 667 MW facility comprising four dual-fuel open-cycle fast-start gas turbines; the requested DUID CG3 appears to be one unit/share of that station, but no plant-specific construction cost was located.